Sign In | Join Free | My udpf.com |
|
Brand Name : ROTY
Model Number : RT-2.0FSD
Certification : CE,ISO
Place of Origin : CN
MOQ : 1
Price : USD 46900.00 -58800.00 set
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 5 SETS
Delivery Time : 50 DAYS
Packaging Details : Fumigation wooden case
After-sales Service Provided : Engineers available to service machinery overseas
Usage : 3 or 4 sides sealing pouch packing
Capacity : 30-70 Bags/min
After Warranty Service : Free spare parts,Video technical support provided
Power : 6.5kw
Rack Material : SUS 304
Voltage : 50Hz380V
Packaging Material : PP.PET.PVC /OPP
Automatic Spicy Powder Filling And Packing Machine 4 Sides Sealing Pouch Filling Machine
1. Premade pouch for big volume flat and doypack packaging
2. Equipped with different metering device, it can realize packing different material such as powder, liquid, granule, sauce , food etc.
3. Compact design , easy to operate and maintain.
4. Automatic lubrication system
Specification:
Item | Parameter | |
Pouch | Min pouch | 95mm * 95mm |
Max pouch | 210mm * 270mm | |
Output/min | 20—40pouches/min | |
Packing volume | 1000ml(max) | |
Machine | oversize | 2750 (L) х 1000 (W) х 1550 (H)mm |
Weight | 1000Kg | |
Machine | The noise index | <72dB |
Relative humidity | <85% | |
Power | AC380V,50Hz | |
Volate | 5.0 Kw | |
Work pressure | 0.5MPa | |
Gas consumption | 0.6M3/MIN |
Main Components | Vendor |
PLC | MITSUBISHI |
Touch Screen | ORMON |
Inverter | MITSUBISHI |
Servo Motor | ORMON |
Photocell | Autonics Korea |
Main Motor | ABB |
Pneumatic Parts | AIRTAG |
Vacuum Generator | AIRTAG |
Bag Types:
Real Picture in the workshop
Our products includes vertical packing machine,horizontal packing machineandpackage production line and automatic liquid filling production line etc.
Packing EXPO
International stardard wooden box packinage machine
The initial installation is NOT included with the professional ROTY team member. All installation with the ROTY team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours..
ROTY provide free parts and parts delivery, when manufacture defects has been detected during normal operation (vulnerable parts not included) under warranty period.
![]() |
PLC Spicy Powder Filling And Packing Machine 6.5kw Automatic Lubrication System Images |